Sulphate Ammonium Plant

Investor / client
Apatit JSC
Building period
2018 - 2019
Location
  Cherepovets, Russia
Project description
Types of works: survey work, design work, excavation work, pile driving, concrete work, installation of metal structures, delivery, installation and commissioning of processing equipment, installation of pipelines, electrical works and any other works associated with the implementation of the project.

Total project duration: 17 months.

The total number of staff in the period of maximum workload: 250 people.